| Bow Hill Road Reconstruction Concrete -Sauk Valley Road Farm to Market Road / Josh Wilson Road Intersection Improvements Francis Road Reconstruction: Section 1 Garden of Eden Rd/Willard Creek Culvert 2021 HMA Overlay Project Josh Wilson Road: Phase 1 North Shore Drive Roadway Repair Sinclair Dock Replacement Sinclair Island Marine Access Upper Finney Creek  Bridge (Seismic Retrofit)
 | Garden of Eden Road/Willard Creek Culvert Replacement ProjectProject  Number ES63440-3
Project  DescriptionThis project, located on Garden of Eden Road, will  replace the Willard Creek culvert crossing with a fish passable structure. The  existing system consists of two 36‐inch diameter corrugated metal pipe culverts  that have failed due to corrosion and rust.   This has resulted in roadbed erosion that caused a sinkhole to form in  the roadway.  This sinkhole has been  patched by Skagit County Public works by placing a steel plate over the area.
 After the replacement of the culvert is complete, this  section of road will be repaved, and new guardrail sections will be installed  adjacent to the new structure and roadway. 
 Project  Schedule
 Currently  under design and securing necessary permits.
 Construction,  summer of 2022.
 
 The  Engineer’s estimated construction cost range is between $300K and $500K.
 Funding  Sources For more  information, contact:Sonny Andrew – Project Manager
 (360)416-1400 /  sonnya@co.skagit.wa.us
  
 | Contact Public Works Engineering Assistant  County Engineer | Engineering Division ManagerThomas  Weller, P.E.
 
 1800 Continental Place
 Mount Vernon, WA 98273
 Phone: (360) 416-1400
 Fax: (360) 416-1405
 
 email: pw@co.skagit.wa.us
 
 |